377 Widening Project

377 Widening Project

On Friday, October 12th, TxDot held a public hearing to present the planned improvements of US 377. The project includes the reconstruction and widening of a 6 mile stretch from FM 1171 to Crawford Rd. There is also plans for a raised median, dedicated left-turn lanes, signalized intersections, and a sidewalk on the east side of the roadway for the entire length of the proposed project.


Related Articles

Argyle UMC Holding its Up Ministry Fall Clothing and Shoe Drive

The season is changing and it’s time for Argyle United Methodist Church’s Fall Clothing and Shoe Drive. They are collecting

Great Family Camping Within a Two Hour Drive

by Susan Neuhalfen Now that the weather is going to cool down and the kids are back in school, it’s

Argyle High School Band Ranks Second in UIL State Marching Band Contest

by Susan Neuhalfen The members of the Argyle High School Band learned a very difficult lesson at the 2016 UIL

No comments

Write a comment
No Comments Yet! You can be first to comment this post!

Write a Comment

Your e-mail address will not be published.
Required fields are marked*